Engineering Switch Replacement Program Continues
Switches have been re-distributed to the various Engineering departments and are being installed.
New Architecture Hookup
Overhead fibre to connect the Architecture building in Cambridge and their new rental units across the street has fallen through. Talking with Yuri from IST to implement some sort of AP/ mesh connection between the two buildings.