skip navigation

Engineering Switch Replacement Program Continues 

All switches have been re-distributed to the various Engineering departments and are being installed.


New Architecture Hookup


The overhead fibre to connect the Architecture building in Cambridge and their new rental units across the street has fallen through. Working with Yuri from IST to try and implement some sort of AP/mesh connection between the two buildings .