Engineering Switch Replacement Program Continues
Ongoing. All switches have been re-distributed to the various Engineering departments and are being installed.
EIT Network drops
Over the years, unknown to us, users have been installing hubs in EIT.
This is being rectified with a request by Electrical Engineering
to install 102 drops throughout EIT, with about 12 new ones in DC. MAC
address lockdown will be enforced to reduce this problem in the
future. Still in progress
VLAN 16 Cleanup
Currently moving switches off of the shared VLAN 16 onto a private vlan. VLAN 16 was shared between Math and Engineering