Engineering Switch Replacement Program Continues 

Ongoing. All switches have been re-distributed to the various Engineering departments and are being installed.


EIT Network drops


Over the years, unknown to us, users have been installing hubs in EIT. This is being rectified with a request by Electrical Engineering  to install 102 drops throughout EIT, with about 12 new ones in DC. MAC address lockdown will be enforced to reduce this problem in the future. Still in progress

VLAN 16 Cleanup


Currently moving switches off of the shared VLAN 16 onto a private vlan. VLAN 16 was shared between Math and Engineering