Engineering Switch Upgrade Program Continues
Ongoing. Still have 15 old Cisco switches to upgrade across Engineering.
EIT Network drops
VLAN 16 Cleanup
A number of departments within Engineering are still hard coding IP numbers. A project has been put forward to migrate these groups to use DHCP. This will require physically or remotely visiting each affected machine. Timeline for completeion, end of 2009.
Aruba switchover Project
Architecture has been switched over to Aruba. EIT is next and should be finished by the end of this week. The three remaining Engineering buildings should be finished over the next couple of weeks