Engineering Switch Upgrade Program Continues 

Ongoing. Still have a couple of old Cisco switches to upgrade across Engineering.


DHCP project

 

A number of departments within Engineering are still hard coding IP numbers. A project has been put forward to migrate these groups to use DHCP. This will require physically or remotely visiting each affected machine. Timeline for completion middle of 2010.

 

DC Point Of Presence project
 
Done. 17 Engineering switches in DC have been  moved to direct fibre connections to a new POP in the building located in the CIM part of DC with a link back to the Engineering router.