Engineering Switch Upgrade Program Continues

 

Ongoing. There still are a couple of old Cisco and Extreme switches to upgrade across Engineering.


DHCP project Continues

 

A number of departments within Engineering are still hard coding IP numbers.  Engineering is starting to migrate these groups to use DHCP. This will require physically or remotely visiting each affected machine. Everyone that has moved over to E5 is now using DHCP. Plans are to move EIT and ERC over by Christmas. Time line for all Engineering 2011.

 

E5 Networking

 

All networking has been completed including the wireless network. 



Engineering TR re-keying project

 

IST has finished a tour of all Engineering TRs. To assist IST and to make TR access more accessible/secure within Engineering, especially shared TR's, Engineering is standardizing the TR lockset.