Engineering Switch Upgrade Program

 

Still four old Cisco and one Extreme switch to upgrade across Engineering.


DHCP project Continues

 

EIT and ERC currently being converted to DHCP. Not completed last term as planned, hopefully this term. Time line for all Engineering, sometime late 2011.

 


Engineering 10 Gig Fibre Upgrades

 

Will be connecting our main backup server to the network at 10 Gigs to reduce "full backups" sometime this term.