Engineering Switch Upgrade Program
Still four old Cisco and one Extreme
switch to
upgrade
across
Engineering.
EIT and ERC currently being converted to DHCP. Not completed last term as planned, hopefully this term. Time line for all Engineering, sometime late 2011.
Will be connecting our main backup server to the network at 10 Gigs to reduce "full backups" sometime this term.