Engineering Switch Upgrade Program

 

There are still five old Cisco and three Extreme switches to upgrade across Engineering. Time line for displaceing the remaining few changed to, January 31st 2011.


DHCP project Continues

 

EIT and ERC currently being converted to DHCP. Not completed last term as planned, hopefully this term. Time line for all Engineering, sometime late 2011.

 


Engineering 10 Gig Fibre Upgrades

 

Two new 10 Gig fibre connections have been added to the Engineering backbone structure. Ecfile1 was upgraded over the holidyas and now has a 10 Gig connection. The Engineering machine room in CPH now has a 10Gig connection to the Engineering E2 router. This has helped reduce backups from 36 hours to 10.