Engineering Switch Upgrade Program

 

Done. All Cisco and Extreme switchs replaced. Architecture is still all Cisco and will need to be done at a later date.


DHCP conversion and IP cleanup

 

Ongoing. Time line for all Engineering, sometime late 2011.

 


Engineering 10 Gig Fibre Upgrades

 

Ongoing. Planning to connect our main backup server to the network at 10 Gigs to reduce "full backups" sometime this term.