Engineering Switch Upgrade Program
Done. All Cisco and Extreme
switchs replaced. Architecture is still all Cisco and will need to be done at a later date.
Ongoing. Time line for all Engineering, sometime late 2011.
Ongoing. Planning to connect our main backup server to the network at 10 Gigs to reduce "full backups" sometime this term.