Engineering Machine room move
Engineering Computing will be moving it's servers from PHY to a new server room in E5 sometime in the future.
Ongoing. Vlan 100 has been cleaned up. Time line for all Engineering, sometime late 2011. Most of EIT has been converted to using DHCP and the Electrical IT people are starting to move machines onto vlan 10 (129.97.10.0/23).
Ongoing. Planning to connect our main backup server to the network at 10 Gigs to reduce "full backups" sometime this term.