Engineering Machine room move
Engineering Computing is moving it's servers from PHY to a new server room in E5. Racks are in and fibre layed. Fibre just needs to be terminated and switch installed.
Ongoing. Most of EIT has been converted to using DHCP. Mechanical Engineering has started moving their clients.
Ongoing. Planning to connect our main backup server to the network at 10 Gigs to reduce "full backups" and a few other critical servers.