Cabling completed for System Design renovations in CPH 1335/1336. Wall mounted switched moved from 1336 to new TR in 1335, all existing cables rerouted. All new cable from renovations in 1335a/b/c installed to new TR in 1335. New TR in CPH 2397 now in use. All new cabling from renovations in 2387 and 2398 routed to new TR.


 


DHCP conversion and IP cleanup

 

Ongoing.

 


Engineering rogue AP investigations

 

A preliminary investigation of rogue AP's was carried out with IST on the 4th, 5th and 6th floor of E5.