Engineering Departmental Moves
More cabling done for System Design renovations on second floor of CPH. WEEF Lab. E2-1310 was upgraded and rewired for 140 workstations this past August.
DHCP conversion and IP cleanup
Ongoing. Most of EIT has been converted to using DHCP, 4 still remain. ECE has cleaned up and freed the 129.97.106.0 subnet. It has been given back to the general UW pool of IPs.
Engineering 10 Gig Fibre Upgrades
Ongoing. This upgrade will now be part of the IST "Independent building routers project".