Engineering Departmental Moves/Renovations
Recabling of DWE-3524 for Systems Design and
E2-1306, the new Lever computer lab. The whole area was gutted and
recabled.
DHCP conversion and IP cleanup
Ongoing.
Engineering rogue AP investigations
Have investigated a number of spaces in CPH with IST and found them to be MAC air units. Had two AP's added to incresae coverage in CPH and E2.
10 Gig upgrades
Added an HP J9546A, 8 port 10 Gig mdules to the main Engineering router.