MMDistillateFinal - page 50

Inside
E6
The new Engineering 6 building (E6) opened in October 2011, and is home to all things Chemi-
cal Engineering.
The impressive 115,000 square-foot building features 48 state-of-the-art research labs for
graduate students and faculty working in the areas of polymer science, biochemical and
biomedical engineering, advanced materials and green reaction engineering, electro-chemical
and process systems engineering.
Watch our video at
Our Catalyst for Success
1...,40,41,42,43,44,45,46,47,48,49 51,52,53,54,55,56,57,58,59,60,...88
Powered by FlippingBook